PFG

Pro Floor Group Estimator

Projects Pipeline

Total Pipeline ↗ $0.00
Won Contracts ↗ $0.00
Conversion Rate ↗ 0.0%
Active Quoting 🔍 0 projects
Follow Up 🔔 0 projects

Project Calendar

Month Year

Auto-refreshes 1m
Embrace The Grind

Company Documents

Company Portal

Store, organize, and access company credentials, insurances, licenses, policies, and files in a visual tile directory

Total Documents 0
Categories 0
Storage Used 0 MB
Latest Upload None yet
Drop company document here, or click to browse
Supports PDF, Word (DOCX/DOC), Excel (XLSX/XLS/CSV), Images (PNG/JPG), and Text files up to 25MB

Won Jobs

0 Won Projects

Manage secured contracts, project timelines, and installation start & end dates

Executive Statistics Dashboard

Live Analytics

Real-time revenue, average markup profitability, pipeline valuation & top-rated client intelligence

Secured Revenue
$0.00
Average Mark Up % (Won Jobs)
0.0%
Active Pipeline Value
$0.00
Conversion & Win Rate
0.0%

Won Jobs Value Over Time

Monthly trend of secured contract revenue & volume (Excl. GST)

Pipeline Stage Valuation & Distribution

Comprehensive breakdown across all workflow stages (Click any stage to filter pipeline)

0 Total Projects

Mark Up & Profitability Analysis

Pricing margins and markup distribution across projects

Won Contracts Markup 0.0%
Active Pipeline Markup 0.0%
Lost Quotes Markup 0.0%

Trade Category Scope Breakdown

Direct cost, material vs labour allocation by trade

Top Rated Clients Leaderboard

Top Performing Accounts

Ranked by secured revenue, project conversion rate, markup profitability & 5-star performance rating

Rank Client Company Performance Rating Secured Revenue Won / Total Win Rate % Avg Mark Up % Actions

Select a Project

#QU-0100
Saved

Client: - | Site: -

Folder: (not set)
Select a Drawing or Finishes Schedule
Browse project files below

No Drawings Selected

Select an architectural floor plan, finishes schedule, or specification document from the gallery on the left.

Active Sheet Main Scope
Mat $0.00
Lab $0.00
Freight
$
$0.00
COGS Total $0.00
Markup
% $0.00
Gross Profit $0.00
Sheet Total $0.00
# Supplier Item Description Category Mat. Qty Mat. Rate ($) Mat. Unit Mat. Total Lab. Qty Lab. Rate ($) Lab. Unit Lab. Total Line Total

No Line Items in this Cost Sheet

Add custom floorcovering items or import quantities directly from a .fez takeoff drawing to begin costing.

Optional inclusions, preparation, substrate notes
Sheet Total $0.00

Client CRM Directory

Manage commercial clients, builders, architects, and primary contacts

CRM Win Rate 0%
Total CRM Clients 0

Estimators & Project Managers

Manage estimating staff, project assignment options, and commission tracking

Suppliers & Materials Catalog

Select any supplier to view their contact details, terms, and full product materials catalog

0 Suppliers 0 Total Products

Cost Sheet Categories & Labour Rates

Define benchmark installation labour rates ($) and measurement units per floorcovering category

Category Standard Labour Benchmarks: These default installation rates and measurement units automatically apply when adding line items, importing products, or choosing a category in your cost sheets. Rates and unit selections auto-save immediately.
Category Standard Labour Rate ($) Labour Rate Unit Actions

Measurement Units (Material & Labour)

Manage, customize, add and delete measurement units used across cost sheets, material catalogs, and labour rate benchmarks

COMBINED LIST

Measurement Units (Material & Labour)

Shared units used across Material Database, Supplier Catalogs, Category Labour Rates & Cost Sheet Line Items
Unit Code Display Name Class / Type Actions

Xero Integration

Sync Clients/Customers and Suppliers between ProFloor Estimator and Xero

Data Synchronization

Ensure Account numbers, Primary person details, Email, Phone numbers, and ABN details are perfectly in sync with your connected Xero account.

Sync Clients / Customers

Import and update customers from Xero to the CRM

Sync Suppliers

Import and update suppliers and manufacturers from Xero

Safe Work Method Statements (SWMS)

WHS Compliance

Upload, categorize, manage, and download SWMS safety documentation for flooring projects and site compliance

Total Documents 0
Activity Categories 0
Site Safety Standard Safe Work Australia
Latest Upload None yet
Drop SWMS document here, or click to upload
Supports PDF, Word (.docx), Excel (.xlsx), and Images. Choose or type the SWMS activity type during upload.

Database & Automated Backups

Safe snapshot backups of your ProFloor SQLite database with automatic 30-day retention.

Database Engine: SQLite (WAL Concurrent Mode)
0 Backups Found
Backup Snapshot Filename Created Timestamp File Size Retention Status Actions

Quote Exclusions

Quotation Standards

Manage standard exclusion clauses and disclaimer items available to attach to project quotations and proposals

7 Exclusions Clauses can be selected on any project cost sheet summary to appear in the quote document.
# Exclusion Clause / Description Classification Active Projects Actions